What Does a Basement Development Cost in Edmonton?

Most of the basements we build land between $40,000 and $100,000 before GST. These are our real price ranges, real jobs we have priced and the surprises we plan for.
Home · What Does a Basement Development Cost in Edmonton?

Basement development cost in Edmonton starts at about $40,000 before GST. Most of the basements we build land between $40,000 and $100,000. Size, rooms and finishes decide where yours lands, and older homes can add costs once the ceilings open. Below are our price ranges, real jobs we have priced and the surprises we plan for. Every price is before GST.

How Much Will My Basement Cost?

Most of our basements cost $40,000 to $100,000 before GST, and entry-level basements start at about $40,000.

The range depends on how much space you finish and what goes into it:

LevelTypical range (before GST)What it usually includes
Entry level$40,000 to $47,000About 500 to 550 sq ft, with a bedroom, a bathroom and a living area
Step up$47,000 to $60,000Closer to 700 to 800 sq ft, often with a second bedroom or a space for entertaining
Custom$60,000 to $100,000More space, a wine room, built-in cabinets, soundproofing or higher-end tile and flooring
Larger customOver $100,000Bigger, higher-end basements, sometimes as part of a larger renovation

Close to half of our basements over the last couple of years landed in the custom range. Wine rooms and built-ins usually put a basement there, like a basement we built with a wine room.

Many families spread the cost over time. We offer ways to finance your basement with monthly payments through Financeit.

How Much Does a Basement Cost Per Square Foot?

Our base package is $39,900 for 500 square feet, and each square foot over 500 adds $50.

The rule runs up to 1,000 square feet. A 600 square foot basement starts at $44,900, and 700 square feet starts at $49,900. At 800 square feet the starting price is $54,900. A 900 square foot basement starts at $59,900, and 1,000 square feet starts at $64,900.

These are starting prices for the base package. Two basements of the same size can still land far apart, because rooms and finishes matter more than footprint. We use the square footage as a starting point, then price the rooms and finishes you choose.

What Comes With a NUVO Basement Package?

Every base package includes one bedroom, one bathroom, a living room and a finished stairwell and hallway.

The mechanical room, which holds the furnace and water heater, stays unfinished. So does the storage under the stairs. Every basement development we build includes permits, inspections, project management and a two-year workmanship warranty.

What Makes My Basement Development Cost More or Less?

Bathrooms, bedrooms and finishes move the price the most, followed by plumbing that is already in place.

  • Bathrooms.A full bathroom costs more than a powder room, which has a toilet and a sink but no shower. Basement bathroom cost depends mostly on how far the bathroom sits from the existing drain.

  • Bedrooms. Each extra bedroom adds to the price. A bedroom also needs an egress window, a window big enough to climb out of in an emergency.

  • Existing rough-ins.A rough-in is plumbing put in place before the walls close, ready for fixtures to connect later. Rough-ins already in the floor make plumbing cheaper.

  • Finishes. Flooring, lighting and bathroom finishes can swing the total by thousands.

  • Wet bars and kitchenettes.Both add plumbing and can take a longer permit. A wet bar is a bar with its own sink, and basement wet bar cost turns on that plumbing.

  • Layout.An open family room costs less than several separate rooms. Planning a basement layout early keeps the rooms you want inside the budget you set.

Will My Basement Go Over Budget?

About half of our clients finished within 5% of their original selections budget, and some came in under.

Selections are the finishes and fixtures you choose, like flooring, tile and lighting. Roughly a third of our clients went 5% to 15% over. One in five went more than 15% over, usually because of higher-end finishes or added features. When a client leans toward nicer finishes, we suggest planning 5% to 10% on top of the project price.

What Surprises Can Add to My Basement Budget?

Most surprises are small, like floor levelling at about $500 to $3,000, though a few cost more.

In newer homes, surprises are usually small. Flooring makers set how level the floor must be. Levelling to that spec usually lands at the low end of the range.

Rough-ins can also sit in the wrong spot. In a newer St. Albert home, the builder’s rough-in didn’t suit the planned bathroom. We broke the concrete and trenched the plumbing over, which means cutting a channel in the floor for the pipe. Then we levelled the floor after the patch.

Drains need slope to work. On another basement, the main drain sat too high for the new bathroom drains to slope. Extra digging and plumbing added about $3,000.

Could My Basement Have Asbestos?

If your home was built before 1990, it could, so we test for asbestos before we disturb anything.

A third-party company tests the materials first. If the test is positive, a third-party abatement company removes the asbestos safely. Next, the air is tested. A clearance letter, the tester’s written confirmation that the air is safe, comes before work carries on.

Alberta’s asbestos safety rules require suspect materials to be tested before demolition begins. We book the testing and plan the schedule around it.

Asbestos can hide where nobody expects it. In a 1960s Kenilworth basement, it was in the tape on the old ductwork. We found it once the ceilings opened, and removal cost about $4,000.

What Else Can an Older Home Add to My Basement Cost?

Older homes can need floor, plumbing or framing work once the ceilings and walls open.

In Westmount, we took on a restricted head height basement renovation in an early-1900s home. The concrete floor sat about 7 inches out of level, so we dug it out and poured it again.

None of this means an older home should stay unfinished. We talk these possibilities through at the consultation, especially in older homes, and leave room for them in the budget.

How Can I Estimate My Own Basement Development Cost?

Our basement development calculator prices your size, rooms and finishes in a few minutes.

It starts from the base package and adds the upgrades you pick. Before we start building, we give you a written quote that spells out what’s included, from permits to finishes.

A legal basement suite is a different project. It usually runs about $105,000 to $150,000. What a legal basement suite takes in Edmonton goes well beyond a standard basement.

Basement Cost Questions From Edmonton Homeowners

How much does a basement development cost in Edmonton? Most of our basements cost $40,000 to $100,000 before GST. Entry-level basements start at about $40,000.

Does the price include permits? Yes. Every package includes permits, inspections, project management and a two-year workmanship warranty.

How much does each extra square foot add? $50 for each square foot over 500, up to 1,000 square feet.

Do older homes cost more to develop? Often, yes. Homes built before 1990 get asbestos testing first, and hidden issues can add a few thousand dollars.

How long does a basement development take?Most of our builds take 8 to 11 weeks once permits are approved. How long a basement development takes also depends on the permit wait.